AIU-0247 ยท Release result
4 items need attention before full release.
Conditional
Release only after the named conditions are owned.
Planning may continue, but production should not begin until the conditions below are resolved.
- Part
- Control enclosure
- Revision
- Rev C
- Quantity
- 24
- Due
- Aug 28, 2026
- Material
- 6061-T6 aluminum
- Operations
- 5
Release conditions
4 open
- 01Assign available materialBlock
The specified material is not assigned to this job.
- 02Assign the material lotBlock
The material is specified, but no available or ordered lot is attached.
- 03Name the first article ownerOwn
The first article needs a named person responsible for acceptance.
- 04Confirm outside-process timingRisk
Outside work is planned, but its lead time has not been confirmed against the due date.