How small-batch scheduling differs from a prototype.
A single simple part may fit the normal 24-to-48-hour window. A batch is scheduled from total machine hours, part count, geometry, review needs, and active capacity, so the confirmed plan may extend beyond prototype timing.
01 // FIRST ARTICLE Prove the revision before scaling quantity
When fit or function is still changing, begin with a representative part. A wrong hole or clearance is inexpensive at one unit and expensive across a full batch.
02 // BATCH PLAN Set quantity from the actual deployment
Quote the number needed for the pilot, field team, fixtures, or bridge interval. For large batches, contact AIURION directly so the complete run can be priced and scheduled against current capacity.
03 // REPLENISHMENT Reorder from a controlled revision
Preserve the source file and revision used for the accepted batch. Replenishment should start from the approved geometry, not a folder of nearly identical exports.